Everything we've built so far, what's left, and when it ships.

This document formalizes the work completed on the Hybrid Creative website to date and lays out a finalized timeline for the remaining deliverables. The build started as a three-page site and grew into a full multi-page portfolio platform — this scope captures the full journey, what's already shipped, and the dates everything else lands.

Prepared for Paty Fort Lauderdale, FL Issued April 27, 2026 Active Engagement
9
Pages Live
3–6
Pages Remaining
4
Milestones Ahead
May 22
Site Live

Three weeks. Four milestones. One deployment.

Work begins Monday, May 4. Project pages roll out across the first two weeks with copy finalization running in parallel. Account setup and deployment land in week three. Click any bar or milestone to drill in.

A note on dependencies. Deployment week (May 18–22) requires copy sign-off plus access credentials in hand by May 18. See the Investment section for what's needed — anything that slips on that date pushes the deployment.

What's already shipped.

Itemized below by category. This represents the full body of work delivered to date — pages built, copy written, media optimized, animation systems configured, and SEO foundations laid.

Website + Architecture 9 Pages

The site — built, structured, and indexed.

Pages Live

  • Homepage — hero, featured projects
  • About — studio narrative
  • Portfolio Index — full project grid
  • FAQ — expandable Q&A
  • Terms & Conditions
  • Privacy Policy
  • Project pages — Oro, Ghee, Paya

Architecture + SEO

  • Information architecture across all 9 pages
  • Navigation hierarchy + URL structure for portfolio
  • User journey mapped from entry through contact
  • Alt text on every image, keyword optimization, meta titles
  • Semantic HTML, responsive across desktop, tablet, mobile
Media & Animation

Copy, imagery, and the motion system that ties it together.

Copy + Content

  • Copy written and collated for all 9 pages
  • Project narratives for Oro, Ghee, and Paya
  • FAQ question and answer set drafted
  • Terms & Privacy drafted in full

Media + Motion

  • Image and video editing, compression, and refinement across every page
  • Animation library researched, integrated, and configured
  • Industry-standard scroll-driven interactions implemented
  • UI feel uplifted to match references — heavier than initially scoped
Iterations + Working Sessions

Two revision rounds. Three meetings.

  • Two full rounds of revisions across the site — design, copy, and motion
  • Three working sessions for strategy, review, and direction-setting

What's left, by category.

The remaining build work, account configuration, and deployment steps. Each item is scheduled into the timeline below with a finalized completion date.

Project Pages

Additional Case Study Pages

  • Three to six additional project pages (one per project)
  • Each page follows the established Oro / Ghee / Paya template
  • Copy, image curation, animation, and SEO applied per page
  • First three by May 8, all remaining by May 15
Domain

Domain Migration from Squarespace

  • Domain transfer initiated and configured
  • DNS records updated for new hosting environment
  • Email and forwarding records preserved
  • Final cutover scheduled for deployment week
Email Capture

Resend Account + Form Integration

  • Resend account configured under Hybrid Creative's domain
  • Email list and signup form on the site
  • Form submissions routed to Paty
  • Auto-confirmation email back to the user who submitted
Discovery

Google Business Profile

  • Google Business Profile created and verified
  • Brand identity, hours, location, and links populated
  • Linked to the new domain for local discovery + reviews

Covers everything in this scope — completed work to date plus remaining deliverables through site-live on the week of May 18. Two rounds of revisions per page are included; further rounds beyond that are scoped separately.

Total Engagement
$2,500
Flat fee, billed on completion. Includes the engagement to date and the remaining scope through deployment in the week of May 18, 2026.
What I Need by May 18
  • Final copy approval across all pages — a simple "approved" reply
  • Squarespace account access — added as contributor or credentials shared securely
  • Google account access — for domain configuration, Resend, and Google Business Profile
Anything that slips on May 18 pushes deployment proportionally.
After deployment. Once the site is live, ongoing support — additional pages, content updates, SEO maintenance, design work — is available on a monthly retainer. Happy to walk through retainer options once we've crossed the launch line.